First Air Warfare Destroyer HMAS Hobart being tested ahead of handover to Navy later this year

Whats been spotted in and around our Navy
Post Reply
User avatar
MikeJames
Club Member
Club Member
Posts: 4935
Joined: 20 Jan 2010 09:43
Fleet Base: Sydney
My Ship Yard: RAN DDL HMAS Kokoda
Australian Coast Guard cutter Nemesis
RAN FCPB HMAS Wollongong
German SAR Launch DGzRS Berln
SS Geest Atlas (Building)
Location: Sydney
Contact:

First Air Warfare Destroyer HMAS Hobart being tested ahead of handover to Navy later this year

Post by MikeJames »

First Air Warfare Destroyer HMAS Hobart being tested ahead of handover to Navy later this year
By Lauren Waldhuter ABC
Posted about an hour ago

Image
The sea trials are meant to identify any problems with the destroyer, before the Navy takes delivery.

Combat and communication systems on Australia's first Air Warfare Destroyer (AWD) ship, HMAS Hobart, are being tested at sea this week — marking one of the final stages of construction before it is handed over to the Navy.

The Hobart was the first of three destroyers built at Adelaide's ASC shipyard.

It was launched in 2015 amid cost blowouts and construction delays.

Defence Industry Minister Christopher Pyne said the set of trials, known as sea acceptance trials, marked the start of the formal ship-acceptance process, before delivery later this year.

"These trials are conducted to prove that systems can perform the expected functions they were designed for, in the environment in which they'll be required to function," he said.

"In the maritime domain, sea trials are similar to new model cars being tested on the proving grounds and allow the detection of any issues before the ship is accepted by the Royal Australian Navy."

The Federal Government said the milestone showed the project was getting back on track.

In 2015, an audit showed the total cost of the AWD project had blown out to about $9 billion.

It predicted the second and third ships could be completed more than two years behind schedule.

But last year, the second ship, HMAS Brisbane, was floated seven months ahead of the schedule that HMAS Hobart had been on at the same point in its construction — showing that efficiencies had been made.

The third ship, HMAS Sydney, is more than half-complete.

ASC has been shedding hundreds of jobs as the project winds down.

Image
Some of the features of the Air Warfare Destroyer Hobart
User avatar
MikeJames
Club Member
Club Member
Posts: 4935
Joined: 20 Jan 2010 09:43
Fleet Base: Sydney
My Ship Yard: RAN DDL HMAS Kokoda
Australian Coast Guard cutter Nemesis
RAN FCPB HMAS Wollongong
German SAR Launch DGzRS Berln
SS Geest Atlas (Building)
Location: Sydney
Contact:

Re: First Air Warfare Destroyer HMAS Hobart being tested ahead of handover to Navy later this year

Post by MikeJames »

Images of Hobart on sea trials

Image

Image

Image

Image
Post Reply